PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing platforms around Elev. 7-Stair -4,5 Facing East (800x600).jpg Beam pockets at Elev. 1,2,3 Facing East  (800x600).jpg Compacting soil at c. l C.7 (3.5-4) Facing West (800x600).jpg Hoisting the platforms for Elev. 7-Stair -4,5 Facing East (800x600).jpg Stripping the bearing plate boxes at Elev. 1,2,3 Facing South (800x600).jpg Waterproofing along foundation walls at c.l 1 (D-G.1) Facing North-East (800x600).jpg
Previous pageNext page Beam pockets at Elev. 1,2,3 Facing East  (800x600)
Beam pockets at Elev. 1,2,3 Facing East (800x600)